[+] Cube Counter Total:
0 Container Full
[+]

[-] Container Worksheet

Model List
Table
Total Qty 0 ETD 0
Total CuFt 0.00
0 Container Full
Confirm Shipping Information
* ETD Preference
* Freight Forwarder Preference
Quantity shown on website may not be live inventory.Our specialist will contact you prior to shipping date.
Category
Loading...
8435BE-CR Corner Seat
See more from Livia Collection
Quantity:

Availability: 27

Product Description

Maximize the modularity and comfort of your living space with this essential corner seat, the flexible connection piece for building your ideal custom chenille sectional sofa. Upholstered in a soft, light-toned chenille fabric, this piece is built for long-term use on a strong solid wood and plywood frame, providing a reliable 300lbs weight capacity. It offers plush, deep-seated support with high-density foam padding over pocket coils. For easy cleaning and extended life, it features practical reversible back and seat cushions with removable cushion covers with zippers, and comes complete with two decorative pillows to enhance your corner arrangement.

Weights & Dimensions

  1. Overall Gross Weight: 122.00 lbs
  2. Overall Net Weight: 100.00 lbs
  3. Overall Dimension: 44 x 44 x 40H
  4. Seat Width: 26"
  5. Seat Depth: 26"
  6. Seat Height: 20.5"
  7. Leg height: 2.75"
  8. Pillow dimension: 21 x 21 (2)

Product Details

  1. Country of Origin: Vietnam
  2. Solid wood and plywood frame
  3. High-density foam padding over pocket coils
  4. Chenille fabric upholstery
  5. Reversible back and seat cushions
  6. Removable cushion covers with zippers
  7. Solid wood legs in dark brown finish
  8. 2 décor pillows included
  9. Assembly required
  10. Weight capacity: 300lbs
  11. Fabric Type: Chenille
  12. Fabric Color: Beige
  13. Fabric Content: 100% polyester
  14. Fabric Cleaning Code: Upholstery (S)

Packaging

  1. Number of Boxes: 1
  2. Overall CuFt: 36.8404
  3. Package Dimension: 45.5 x 45.5 x 30.75H
  4. Piece per Carton: 1
  5. Assembly Instruction:
*Due to supply chain headwinds, ETA for confirmed containers may be pushed back as much as 8 weeks from current ETA dates. ETA for unconfirmed containers may be pushed back as much as 12 weeks.